German Facility, Built at Breakneck Speed, Accepts Gas Shipment From U.S.

[ad_1]

The shipment arrived at the LNG import terminal in the port town of Wilhelmshaven, a facility that was built in less than a year to help Germany avert an energy shortage.

[ad_2]

Source link